Cooling Tower Inspection & Clean
During a recent cooling tower inspection, we found a large build up of scale throughout the tower. We submitted a detailed report to the client complete with comprehensive photographic support.


Scale in pack

Scale in pack

Air inlet panel

Air inlet panel

Scale out of bottom layer of pack
Scale out of one air inlet panel


Floor before clean
Floor before clean


Scale from pack
Floor before clean


Floor after bagging scale
Floor after bagging scale


Splash guard before clean
Splash guard before clean



Splash guard after clean
Splash guard after clean

Roof after clean
Roof before clean


One old grommet, one new grommet

Spray nozzles -

Blocked nozzle
Blocked nozzle
Cooling Tower Surveys
During a recent cooling tower survey, we found a huge build up of slime in the cooling towers which can harbour and provide nutrients for Legionella bacteria.


Above: Green slime and sediment in the cooling towers
Below: Sediment and slime in the pack



We recommended that the Legionella risk assessment and the water treatment programme be reviewed as a matter of urgency as we feel that the towers present a considerable risk at the moment. This was further compounded by the fact that the towers were observed to have large amounts of drift coming from the fan area whilst in operation. As a precaution we recommended that the towers be cleaned every 3 months until the conditions are improved and the source of the slime has been identified.
Cooling Tower Deep Clean
This cooling tower was generally in a satisfactory condition. Scale was removed with the aid of pressurised water and a scouring pad, and the fill pack was removed and cleaned with a mild acid solution to remove the scale. The pond was cleaned using a submersible pump and vacuum to remove sediment and scale.
Click on pictures for a full size view
Tower wall before clean
Tower wall after clean
Pond before clean
Pond after clean
Fill pack and spray bars before clean
Fill pack and spray bars after clean
Scaled fill pack before clean
Fill pack after clean
Tower internal before clean
Tower internal after clean
Cooling Tower Deep Clean
This cooling tower was extremely fouled with gelatinous deposits. The pack, air inlet panels and drift eliminators were removed and pressure washed to remove all of the deposits. The tower sumps were vacuumed out and all internal surfaces were washed. We then replaced the clean tower pack infill, the drift eliminators and the air inlet panels for each cell.
Click on pictures for a full size view
Slime in the pack prior to clean
Foam and slime in the sump prior to clean
Fouled sump prior to clean
Slime on the basin prior to clean
Foam and slime in the sump prior to clean
Sump following clean
Pack following clean
Cooling Tower Inspections & Cleans
During cooling tower inspections, we found a large build up of scale throughout towers, dirty and collapsing air inlets, corrosion in drift eliminator frames, brittle drift eliminators and collapsing supports.



Air inlets
Air inlets
Cleaning air inlets

Damaged air inlets

Repaired air inlets

Damaged drift eliminators


Damaged pack
Collapse


Brittle drift eliminators
Collapsing tower



Dirty trough
Dirty trough
Dirty trough

Drift eliminators with rusted frames

Timber pack repairs

Dirty trough, almost completely full with debris